Electronic Recycling Center

24
Jul

FDC & Associates was retained by Apex Concepts to prepare final engineering plans and documents for two tilt-up buildings approximately 14,000 sq. ft. on a 2.4 acres site. The project included mass site grading to raise the pad to street level. The grading required a FEMA flood plain modification map as well as a comprehensive hydrology and hydraulic plan. The site was used by the City of Perris as a detention basin for offsite flows. Therefore, FDC & Associates engineers developed plans to route the on site surface flow to storm chambers and offsite flows were captured on the end of the cul-de-sac and routed underneath and across the site to a headwall and rip-rap outlet.

Project Location:

Johnson Ave. & Business Park Drive

Client:

Mr. Elias Zeitoune

Apex Concepts

24570 Stewart St., Suite 26

Loma Linda, CA 92354

Reviewing Agency:

  • City of Perris Planning Department
  • City of Perris Public Works
  • City of Perris Building and Safety

Key Components:

  • Final Engineering
    • Water Improvement Plans
    • Storm Drain Improvements Plans
    • Rough and Precise Grading Plans
    • Street Improvement Plans
    • Erosion Control Plans
    • Hydrology
  • Landscape Architecture
    • Landscape Plans and Irrigation Plans
  • Land Surveying
    • Topography Field Survey
  • Geotechnical
    • Soil Investigation Report